All systems normal
02:32:54
SATURDAY, 28 NOVEMBER 2026 · LIVE SIMULATION
Building overview
Live operations · Central plant and building systems
Cooling demand
72%
↑ 4.2% vs. last hour
Plant power
438kW
↓ 2.1% energy use
Active alarms
00events
No active alarms
Indoor air quality
612ppm CO₂
Within target · < 800 ppm
Chiller plant schematic
CHW loop · 2 chillers · 4 pumps · 2 cooling towers
CHILLED WATER SUPPLY · 6.8°C
CH-0172% LOAD
CH-02STANDBY
CHILLED WATER RETURN · 12.6°C
CHWP-01 RUNCHWP-02 STBYΔP 142 kPa
Supply & return temperatures
Chilled water · last 60 minutes
Equipment status
Plant equipment · 8 devices
CH-01Water-cooled chiller
Running72%CH-02Water-cooled chiller
Standby—CHWP-01Primary CHW pump
Running48 HzCWP-01Condenser water pump
Running46 HzEnergy efficiency
Plant efficiency · kW / ton
0.62kW / ton
8.4% more efficientTarget < 0.70
10:15:05AHU-01 valve modulated to 65%BMS
10:14:52CH-01 operating at 72% loadBMS
10:14:31CHWP-01 VFD setpoint 48.2 HzBMS
10:12:08All systems nominal · BACnet/IP onlineBMS