All systems normal
02:32:54
SATURDAY, 28 NOVEMBER 2026 · LIVE SIMULATION

Building overview

Live operations · Central plant and building systems

Cooling demand
72%
↑ 4.2% vs. last hour
Plant power
438kW
↓ 2.1% energy use
Active alarms
00events
No active alarms
Indoor air quality
612ppm CO₂
Within target · < 800 ppm

Chiller plant schematic

CHW loop · 2 chillers · 4 pumps · 2 cooling towers

CHILLED WATER SUPPLY · 6.8°C
CH-0172% LOAD
CH-02STANDBY
CHILLED WATER RETURN · 12.6°C
CHWP-01 RUNCHWP-02 STBYΔP 142 kPa

Supply & return temperatures

Chilled water · last 60 minutes

Supply Return

Equipment status

Plant equipment · 8 devices

CH-01Water-cooled chiller
Running72%
CH-02Water-cooled chiller
Standby—
CHWP-01Primary CHW pump
Running48 Hz
CWP-01Condenser water pump
Running46 Hz

Energy efficiency

Plant efficiency · kW / ton

LIVE
0.62kW / ton
8.4% more efficientTarget < 0.70
SIMULATION ACTIVELast sync 02:32:54 · BACnet/IP · Modbus TCP
10:15:05AHU-01 valve modulated to 65%BMS
10:14:52CH-01 operating at 72% loadBMS
10:14:31CHWP-01 VFD setpoint 48.2 HzBMS
10:12:08All systems nominal · BACnet/IP onlineBMS